2016年2月25日 星期四

§ National Taichung Theater

National Taichung Theater is located in Xitun District, Taochung. It is a very characteristic performance area. The theater is designed by Japanese architect Toyo Ito. Using the concept of the primitive caves and holes, Toyo Ito designed the world first and only Sound Cave Curved Wall for National Taichung Theater. There are no vertical and horizontal structures and it’s the world’s first curve surfaced hanging structure architect. Due to the complexity, it is known as the most difficult architect to complete. Five years and NT$ 4.36 billion, the theater finally open in November 23rd, 2014. The theater is organized into a large theater, medium theater and experimental stage, which hold up to more than 3000 guests.

During the urban renewal in Taichung, Taichung city government tried get the Guggenheim Museum to join the museum project in Taichung. Unfortunately due to the budget shortage, the project was canceled. After Architecture Design Competition for the later idea to build a national theater, Toyo Ito’s design was selected. But the difficulty of building this monster in reality caused investments backing out over and over. But after conquering the obstacles, they finally broke the ground in the end of 2009.

The acoustic engineering was carefully designed. In the large theater, guests will see the round curve on the ceiling; this will reflect the sounds perfectly in every angle to every seat. A cat walk is organized on the top for maintenance purposes. The view to the stage will not be blocked in anyway. Everything is designed to what a theater may need in the best way. The exterior shapes like a tea pot during the day with the extraordinary curves. When the night falls, lightings will put the theater under the spot light.
Keyword:
Characteristic特性
Primitive原始
Vertical垂直
Horizontal
Monster怪物
backing out 停止不幹
Conquering征服
Exterior外觀
Extraordinary非凡

Who: Taichung city government
When : Since 2008
Where: Taichung
Why: Finical problem
What: There was a finical problem about National Taichung Theater, so it took a lot of time. And in 2014, it finally started to work.  

How: Toyo Ito’s design decided to build this monster.